I have been reading this forum for a couple months and there is lots of great information. I have read various things about glue down VS nail down. I am building a house which I am GC ing myself. I plan on installing 4 inch or preferablly 5 inch white oak select and better. My subfloor is 3/4 inch OSB. If I go with the 5 inch can it be nailed or stapled down? The distributor is telling me it has to be glued and nailed. I live in the New England area so there is a lot of variation in tempatures. Thanks in advance.
↧